IF MedTechStart a project

Pilot & Small-Batch

Enough real units for a clinical evaluation, a regulatory batch or a first sale, built to production records without committing to hard tooling.

When to use it

When a Pilot Batch Is the Right Step

Between a working prototype and full production. Batches of 10 to 500 units, built to production records without committing to hard tooling.

  • Test and Submit

    Units for lab testing, sterilisation and packaging validation, and the samples a regulatory submission needs.

  • Evaluate in the Clinic

    Units for a clinical investigation or a user evaluation. In India, a clinical investigation of a device needs permission under the Medical Devices Rules, 2017.

  • Sell Your First Units

    A first commercial batch. Devices sold in India must be made under a manufacturing licence that covers the device.

How it works

How a Pilot Run Works

  1. Step 1

    Review the Design File

    We check the drawings, parts list, risk file and test status, and list any gaps.

  2. Step 2

    Plan the Build

    Process flow, work instructions, fixtures, the inspection plan and the batch size.

  3. Step 3

    Source and Inspect Parts

    Components are bought or made, then inspected before they enter the build.

  4. Step 4

    Build and Inspect

    Assembly by hand or semi-automatically, with checks during the build and at the end.

  5. Step 5

    Release with Records

    Units are released against the batch record, labelled and packed.

  6. Step 6

    Learn Before Scale-Up

    Yield, defects and process issues feed the changes for larger-scale production.

What you get

What You Bring and What You Get

You Bring

  • Released drawings and specifications
  • A bill of materials, with the parts and suppliers you use today
  • The risk file and the verification results so far
  • Label and instructions-for-use content
  • If something is missing, the design review before the build finds it.

You Get Back

  • The units, labelled and packed as specified
  • A batch record for each batch, with every step signed off
  • Incoming, in-process and final inspection records
  • Traceability from each unit to its component lots
  • Records of any nonconformance or deviation, and how it was handled
  • What the run taught: the problems found and what to fix before scale-up

Plan your batch

Add the units each purpose needs. The planner runs in your browser; nothing is sent until you choose to.

Batch size0

Send this plan to us

Opens the enquiry form with your plan filled in.

Questions

Questions Buyers Ask

Can I sell the units from a pilot batch?

Only when the device is licensed for sale in that market. In India, a device sold commercially must be made under a manufacturing licence that covers it. Units for testing or a clinical investigation need their own permissions. India regulatory dossier explains the route.

Can the units be supplied sterile?

Yes, when the sterilisation method and the sterile barrier packaging are validated for the device. Sterile & assembly support covers that work.

Do test results from pilot units count?

They count when the pilot units are made the way production will make them. If a part comes from a bridge process, such as a soft mould, record why it is equivalent to the production part, or repeat the affected tests on production parts later.

Have a question about Pilot & small-batch?

Opens the contact form with this service named. Nothing is sent until you press send.