IF MedTechStart a project

Larger-Scale Assembly

Volume assembly on our own audited lines in Navi Mumbai, with batch records, traceability and release testing on every build.

When to use it

When Larger-Scale Assembly Is the Right Step

After a pilot batch has proven the process and the design is stable. Assembly moves onto the assembly lines at our TTC Khairane site.

  • Move from Pilot to Volume

    Take a process proven in a pilot batch onto lines set up for more units.

  • Supply a Launched Product

    Repeat batches for a device that is licensed and on the market.

  • Manufacture in India

    Assembly under an ISO 13485 audited quality system in India, for the Indian market or for export where the device is approved.

How Larger-Scale Assembly Runs

  1. Step 1

    Review the Pilot Results

    Yield, defects and process issues from the pilot decide what changes.

  2. Step 2

    Set Up the Line

    Stations, fixtures and work instructions for the higher rate.

  3. Step 3

    Qualify Suppliers

    Suppliers evaluated and purchased parts checked on receipt.

  4. Step 4

    Validate the Changes

    Changed processes validated before they make saleable units.

  5. Step 5

    Produce in Batches

    Each batch built, inspected and released against its batch record.

  6. Step 6

    Monitor and Improve

    Yield, nonconformances and complaints tracked and fed to corrective action.

What you get

What You Bring and What You Get

You Bring

  • The device master record, or released drawings and specifications
  • An approved bill of materials, with suppliers
  • Results and records from the pilot batch
  • A volume forecast
  • The regulatory status of the device in each market you sell to

You Get Back

  • Assembled units, labelled and packed as specified
  • A batch record for each batch
  • Incoming, in-process and final inspection records
  • Traceability from each unit to its component lots
  • Controls on suppliers and purchased parts
  • Records of nonconformances and changes, and how they were handled
Questions

Questions Buyers Ask

Do I need a pilot batch first?

In most cases, yes. A pilot batch shows where the process breaks before you commit to production tooling and volume. See Pilot & small-batch.

What licence does commercial production need in India?

A device made for sale in India needs a manufacturing licence under the Medical Devices Rules, 2017, that covers the device and the site. Agree who holds it before the first commercial batch. India regulatory dossier explains the route.

How are purchased parts controlled?

Suppliers are evaluated before use, and parts are checked on receipt to the level their risk calls for. ISO 13485 sets this out under purchasing controls.

Have a question about Larger-scale assembly?

Opens the contact form with this service named. Nothing is sent until you press send.